{"id":3549,"date":"2016-02-29T08:49:21","date_gmt":"2016-02-29T13:49:21","guid":{"rendered":"http:\/\/sbsa.ca\/portfolio\/abb-campus-montreal\/"},"modified":"2017-03-23T15:51:37","modified_gmt":"2017-03-23T19:51:37","slug":"abb-campus-montreal","status":"publish","type":"portfolio","link":"https:\/\/sbsa.ca\/fr\/portfolio\/abb-campus-montreal\/","title":{"rendered":"ABB Campus Montr\u00e9al"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Cr\u00e9ation d&#8217;un si\u00e8ge multinational et d&#8217;un centre de R et D<\/strong><\/p>\n<p style=\"text-align: justify;\">Nouveau campus de Montr\u00e9al d&#8217;ABB ax\u00e9e sur le rassemblement: trois divisions d\u2019ABB existants d\u00e9plac\u00e9 de leurs installations existantes distinctes en un seul nouveau campus comprenant un centre de recherche et de d\u00e9veloppement de 130,000 pi.ca. et un immeuble de bureaux avec stationnement souterrain de 160,000 pi.ca. Structurellement le projet a \u00e9galement impliqu\u00e9 l&#8217;int\u00e9gration d\u2019\u00e9l\u00e9ments tr\u00e8s diff\u00e9rents: l\u2019acier pour la section de recherche, qui comprend la construction de cinq ponts roulants et le b\u00e9ton arm\u00e9 pour l&#8217;immeuble de bureaux. Le lien entre les deux b\u00e2timents; un atrium de deux \u00e9tages avec une passerelle regardant la zone de recherche a \u00e9t\u00e9 construit avec un m\u00e9lange d&#8217;acier et de b\u00e9ton arm\u00e9, et comprends des marquises qui compl\u00e8tent le lien visuellement.<\/p>\n<p style=\"text-align: justify;\">Le mandat de SBSA comprenait la conception structurelle compl\u00e8te, ainsi que les services d&#8217;ing\u00e9nierie pr\u00e9liminaires et services de phase de construction. SBSA faisait partie int\u00e9grante en conseillant l\u2019entrepreneur du contrat conception-construction lors de l&#8217;attribution du projet, notamment en ce qui concerne le traitement des conditions de sol difficiles et l&#8217;\u00e9valuation de l&#8217;option d&#8217;acier structurel ou b\u00e9ton arm\u00e9 pour l\u2019immeuble de bureau. SBSA a \u00e9galement \u00e9t\u00e9 en mesure de respecter l\u2019\u00e9ch\u00e9ancier acc\u00e9l\u00e9r\u00e9 du projet en compl\u00e9tant les dessins de soumission en sept semaines.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cr\u00e9ation d&#8217;un si\u00e8ge multinational et d&#8217;un centre de R et D Nouveau campus de Montr\u00e9al d&#8217;ABB ax\u00e9e sur le rassemblement: trois divisions d\u2019ABB existants d\u00e9plac\u00e9 de leurs installations existantes distinctes en un seul nouveau campus comprenant un centre de recherche &hellip; <a href=\"https:\/\/sbsa.ca\/fr\/portfolio\/abb-campus-montreal\/\">Lire la suite<\/a><\/p>\n","protected":false},"author":3,"featured_media":3085,"menu_order":10,"comment_status":"closed","ping_status":"closed","template":"","portfolio-type":[44,45],"portfolio-tag":[],"class_list":["post-3549","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-type-conception-de-batiments","portfolio-type-projets-recents"],"_links":{"self":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio\/3549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/comments?post=3549"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/media\/3085"}],"wp:attachment":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/media?parent=3549"}],"wp:term":[{"taxonomy":"portfolio-type","embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio-type?post=3549"},{"taxonomy":"portfolio-tag","embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio-tag?post=3549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}