{"id":3562,"date":"2016-02-25T16:12:36","date_gmt":"2016-02-25T21:12:36","guid":{"rendered":"http:\/\/sbsa.ca\/portfolio\/montreal-forum\/"},"modified":"2025-05-27T15:33:01","modified_gmt":"2025-05-27T19:33:01","slug":"le-forum","status":"publish","type":"portfolio","link":"https:\/\/sbsa.ca\/fr\/portfolio\/le-forum\/","title":{"rendered":"Le Forum"},"content":{"rendered":"<h5 style=\"text-align: justify;\">Modifications majeures au Forum de Montr\u00e9al<\/h5>\n<p style=\"text-align: justify;\">\u00c9tant la seule firme d\u2019experts-conseils en structure de ce mandat, nous avons ex\u00e9cut\u00e9, avec succ\u00e8s, ce projet de 75M$ tout en respectant le budget et l\u2019\u00e9ch\u00e9ancier de construction tr\u00e8s serr\u00e9. Les points culminants de ce projet complexe \u00e9taient :<\/p>\n<p style=\"text-align: justify;\">La stabilisation temporaire des murs p\u00e9rim\u00e9triques de 75 pieds de hauteur par l\u2019installation d\u2019un syst\u00e8me de fermes verticales sur les parois ext\u00e9rieures permettant ainsi la d\u00e9molition totale de l\u2019int\u00e9rieur du b\u00e2timent. L&#8217;\u00e9tayage, reprise en sous-\u0153uvre et construction de murs de fondations auto porteur en b\u00e9ton allant jusqu\u2019\u00e0 37 pieds de profondeur sur tout le p\u00e9rim\u00e8tre.La construction de 2 niveaux sous le sol et de 4 niveaux au-dessus du sol repr\u00e9sentant plus de 2000 tonnes de charpente d\u2019acier et plus de 500,000 pi2 d\u2019espace utilisable. Des modifications majeures et complexes des ponts libres existants supportant la structure du toit dans le but de cr\u00e9er une plus grande hauteur et de permettre d\u2019avoir des salles de cin\u00e9ma suppl\u00e9mentaires. La coordination de la structure avec les architectes du b\u00e2timent aussi bien qu\u2019avec tous les architectes repr\u00e9sentant les diff\u00e9rents groupes de locataires.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Modifications majeures au Forum de Montr\u00e9al \u00c9tant la seule firme d\u2019experts-conseils en structure de ce mandat, nous avons ex\u00e9cut\u00e9, avec succ\u00e8s, ce projet de 75M$ tout en respectant le budget et l\u2019\u00e9ch\u00e9ancier de construction tr\u00e8s serr\u00e9. Les points culminants de &hellip; <a href=\"https:\/\/sbsa.ca\/fr\/portfolio\/le-forum\/\">Lire la suite<\/a><\/p>\n","protected":false},"author":3,"featured_media":1593,"menu_order":-10,"comment_status":"closed","ping_status":"closed","template":"","portfolio-type":[44],"portfolio-tag":[],"class_list":["post-3562","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-type-conception-de-batiments"],"_links":{"self":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio\/3562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/comments?post=3562"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/media\/1593"}],"wp:attachment":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/media?parent=3562"}],"wp:term":[{"taxonomy":"portfolio-type","embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio-type?post=3562"},{"taxonomy":"portfolio-tag","embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/portfolio-tag?post=3562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}