{"id":4941,"date":"2019-07-04T11:10:25","date_gmt":"2019-07-04T15:10:25","guid":{"rendered":"https:\/\/sbsa.ca\/?p=4941"},"modified":"2019-07-04T11:10:25","modified_gmt":"2019-07-04T15:10:25","slug":"les-appartements-bellevue-en-construction","status":"publish","type":"post","link":"https:\/\/sbsa.ca\/fr\/les-appartements-bellevue-en-construction\/","title":{"rendered":"Les Appartements Bellevue en construction"},"content":{"rendered":"<div id=\"pl-4941\"  class=\"panel-layout\" ><div id=\"pg-4941-0\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-4941-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-4941-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t[cycloneslider id=\"bellevue-apartments\"]\n<p>&nbsp;<\/p>\n<h4>Le projet les Appartements Bellevue a atteint son sommet pour la phase 1!<\/h4>\n<p>Situ\u00e9 \u00e0 Montr\u00e9al-Ouest, les Appartements Bellevue, un projet en trois phases de 190 unit\u00e9s en cours de d\u00e9veloppement par Construx, pour lequel SBSA fournit des services complets d'ing\u00e9nierie de structure, est en voie d'ach\u00e8vement de la structure pour la phase 1. Avec la derni\u00e8re coul\u00e9e de b\u00e9ton de la dalle de la phase 1 pr\u00e9vue cette semaine et la livraison des \u00e9l\u00e9ments de structure en acier pour les structures de toit \u00e9galement attendus sous peu, SBSA se concentre maintenant sur la phase de construction pour la phase 2 et la conception pr\u00e9liminaire pour la phase 3.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>[cycloneslider id=&#8221;bellevue-apartments&#8221;] &nbsp; Le projet les Appartements Bellevue a atteint son sommet pour la phase 1! Situ\u00e9 \u00e0 Montr\u00e9al-Ouest, les Appartements Bellevue, un projet en trois phases de 190 unit\u00e9s en cours de d\u00e9veloppement par Construx, pour lequel SBSA fournit &hellip; <a href=\"https:\/\/sbsa.ca\/fr\/les-appartements-bellevue-en-construction\/\">Lire la suite<\/a><\/p>\n","protected":false},"author":3,"featured_media":4994,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[59],"tags":[],"class_list":["post-4941","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-engineering-projects-fr"],"_links":{"self":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/posts\/4941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/comments?post=4941"}],"version-history":[{"count":5,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/posts\/4941\/revisions"}],"predecessor-version":[{"id":5035,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/posts\/4941\/revisions\/5035"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/media\/4994"}],"wp:attachment":[{"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/media?parent=4941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/categories?post=4941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sbsa.ca\/fr\/wp-json\/wp\/v2\/tags?post=4941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}