Cours de Brésoles is a project nestled away in plain sight in the historic Old Port of Montreal for which SBSA is provided the full range of structural engineering services including preliminary design, detailed design, and construction phase services. By integrating existing facades and wood structural elements of the existing structures, the cache of the area was maintained. The project has brought to life two buildings which have been long abandoned.

The Notre-Dame West portion of the project involves a new seven-storey residential building with two underground parking levels. An existing façade facing Notre-Dame Street was conserved, as well as existing archaeological foundations, which were integrated with the new structure.

The Brésoles portion of the project involved the addition of a new 7th structural level and new 8th floor penthouse as well as modifications to the existing structure and access to underground parking.

Construction on the project was completed in 2023.

Beyond its technical achievements, the project has been widely recognized. Hôtel Lambert won Award of the Year in Architecture at the 18th edition of the GRANDS PRIX DU DESIGN, along with double Gold certification in the categories of Commercial Building / Hotel & Resort and Facade – Architecture. The jury praised its balance of heritage preservation and modern innovation, including restoration of rare cast-iron façades and reintroduction of the historic courtyard.

Further underscoring its global impact, Hôtel Lambert is also featured in the Dedalo Minosse Catalogue (12th edition, 2024/2025) in Italy, which celebrates outstanding architectural projects worldwide.

 

  • Client: Tecnicon (consortium between Blenda Construction & Vinac Construction)
  • Architect: Ruccolo + Faubert Architectes inc
  • Mechanical Engineer: Dupras Ledoux
  • Services: Full services including construction phase