Home2 Suites by Hilton in Construction

with No Comments

The Home2 Suites by Hilton in St-Laurent, for which SBSA is providing full structural engineering services, has entered the construction phase! The project, developed, and to be operated by, Devtel Construction, and designed by Giulia San Gregorio architecture, consists of … Read More

ABB CAMPUS IN THE NEWS

with No Comments

ABB’s new Montreal campus was featured in the La Press business section: ABB Canada rassemblera plus de 700 employés dans un tout nouveau siège social de 75 millions de dollars, construit au Technoparc Saint-Laurent par le groupe Broccolini. À l’heure … Read More

ATRIUM WINS AWARD OF EXCELLENCE

with No Comments

The ATRIUM project, who’s structure consist of a mix of structural steel and glulam wood frames, win’s Cecobois’s award of excellence. Learn more below:  Situé au cœur du siège social du Groupe Dynamite à Ville Mont-Royal, l’ATRIUM offre aux employés … Read More

BCC KIRKLAND WINS IIDEX15 AWARD

with No Comments

SBSA provided the structural design for the home of Broccolini’s new Montreal head office – a mixed tenant six story lateral extension to an existing three story building. Rubin and Rotman were the design architects for the building and provided the … Read More